SIM 4210 TEG Gas Dehydration

4210 Triethylene Glycol (TEG) Gas Dehydration Simulation

SIM 4210 TEG Gas Dehydration

SIM 4210 TEG Gas Dehydration model is a fully integrated triethylene glycol (TEG) gas dehydration and regeneration system including an emergency shut-down (ESD) system.

About the sim

Model Description

The model shows an industry standard design for a TEG system with the lean TEG running through a contactor to strip water out of a natural gas stream. The water is then removed from the rich TEG stream through a process of hot distillation where the water is removed as steam and the TEG is recycled back into the dehydration column.

The model contains heat recovery to reduce the heating load on the regenerator re-boiler and the cooling load on the lean TEG feed to the dehydration column.

All unit operations are fully dynamic allowing investigation of the effect of process changes and optimisation.

The design shows a widely used dehydration package and can be used to show how a standard TEG system is used including start-up and shut-down.

The ESD system is fully interactive stopping the system from entering potentially dangerous states and includes a matrix style cause and effect display, overrides and executive action.

Explore More Simulations

SIM 4300 Crude Distillation Unit

SIM 4310 Fractionation Train

SIM 4320 Vacuum Column

Contact us. get in touch. Careers

Speak to our team today

Want to know more about how our products can help you, or want to request a demo? Contact us today.